windward viaduct - hawaii

A value engineering cost proposal was accepted by Hawaii’s Department of Transportation to save both time and money, and minimize disruption of the surrounding environment through a substantial redesign of this project.

This value engineering cost proposal was the largest ever approved by Hawaii’s DOT and the United States Federal Highway Administration.

This was one of two SCI projects nominated in 1999 as one of the top 125 projects over the past 125 years by Engineering News Record, a renowned industry journal.