hillsborough bridge - prince Edward island

Prince Edward Island Department of Transportation had a dilemma. An important transportation link required increased capacity but all preliminary studies had failed to produce a cost-effective solution.

SCI developed an innovative design solution for widening the existing bridge structure at minimum cost while maintaining existing traffic flows during the construction period.

PEI DOT awarded the contract to our firm, and the project was completed ahead of schedule in July of 1998.