Hillsborough Bridge
Prince Edward Island

Home   Mission   Origins   Projects Project Solutions Awards Links Contact Us

 

Click Here to View a Larger Image

Prince Edward Island Department of Transportation had a dilemma. An important transportation link required increased capacity but all preliminary studies had failed to produce a cost-effective solution. SCI developed an innovative design solution for widening the existing bridge structure at minimum cost while maintaining existing traffic flows during the construction period. PEI DOT awarded the contract to our firm, and the project was completed ahead of schedule in July of 1998.


Copyright 2000. SC Infrastructure